Construction Update:
Phase 2

We have entered the home stretch for construction at 6170 Washington Street. Now we can begin to see all the wonderful details that will define the finished buildings, from the imported tile roof to the gorgeous stone work that gives our Hospitality House a timeless feel. Sometimes at ground level it’s difficult to see all the progress that is being made, but from the air it’s possible to see how far we’ve come over a short period of time. Enjoy this latest video and see for yourself how close we are to the finish line.

 

Jim “Bear” Dyke

Proprietor

Join the Mira Winery 
Email List

linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram